Uued Viljapuuaiad — Documentation Hub — May 2026

Nexus

Sovereign process orchestration platform. Four-scale architecture: MACRO canvas → MICRO schema → NANO field → PICO rule. ChameleonV2 RBAC+BDT engine. deltaPrism three-mode GPU data layer. All documents cross-referenced and indexed below.

13 Documents
3 Use Cases
163 Tests Passing
0 Open Decisions
v1.3 Plan Version
All 4 Decisions Resolved
D-05 Real Claude API — D-06 Single org 3 pipelines (Pryzmat Media) — D-07 Mock HTTP Forward (no UAE API) — D-08 Mock SMS (log + canvas). Resolved 2026-04-18. All Phase 5 demo paths unblocked. See Product Plan §10 or WBS Decisions.
01 Strategy

Product vision, competitive positioning, executive framing, and commercial opportunity. Start here for context before reading architecture or use cases.

02 Architecture

System design, component map, API surface, data flows, multi-tenancy, RBAC model, deployment topologies, work breakdown and canvas prototype.

AS-1 Live
NeXus App Requirements
35 requirements across 7 sections: Hub Dashboard, Navigation, Gate Approval, Roadmap, Skin/Theme, i18n, and App Shell. First formal AS-1 capture from AS-0 Primarch sessions. All requirements traceable to AS-0 source. Implementation status tracked per requirement.
AS-1 Requirements 35 reqs
NEXUS-HLD-01 Live
High Level Design
Four-scale architecture table. Component map: Nexus API / Admin / Canvas + ChameleonV2 + deltaPrism + Atlas. 13 node types with milestones. Multi-tenancy org hierarchy. RBAC 6-role model. 3 key data flows. SSE telemetry events. Deployment topologies.
Engineering Architecture
NEXUS-WBS-01 Live
Work Breakdown Structure
47 tasks across phases 1–5. Phase 1 and 2 complete (34 tests passing). Canvas Phase 2, Execution Phase 3, ChameleonV2+deltaPrism Phase 4, Platform+Demo Phase 5. 12 backlog node implementations. All decisions resolved.
47 tasks 5 phases PM / Lead
M-NEXUS-C2 Declared
App Management
Hub management SPA. Environment lifecycle, pipeline versions, backups, RMB menu editor. REQ-MGMT-002, REQ-ENV-003, REQ-RMB-004. BL29.
Sprint 3 Interactive
M-NEXUS-C1 Canvas Prototype
Wormwood App
Four-level interactive canvas prototype. MACRO / MICRO / NANO / PICO tab navigation. Drag-and-drop nodes, SVG edge routing, SSE connection indicator, breadcrumb drill-down. Phase 2 milestone — API wire-up pending M-NEXUS-C2.
Phase 2 Interactive
03 Use Cases

Three validated pipeline use cases. Each document includes: business context, RBAC roles, step-by-step pipeline flow, entity schema, demo modes (autonomous and interactive), and open decisions.

UC1 — NESTO Live
Nesto — UAE Worker Onboarding
Gulf compliance worker onboarding pipeline. 9-step flow: Form → OCR → Validate → Store → HR Gate → Decision → Notify → Forward ×3. NestoWorker entity schema (12 fields). 5 RBAC roles. Autonomous demo under 60s. Blocks D-07 (UAE APIs) and D-08 (SMS).
9 pipeline steps Gulf compliance
COMMERCIAL — NESTO Live
Nesto — Licensing Justification
Commercial justification for the Nesto platform licence. Explains the three-product bundle (Nexus, deltaPrism, Chameleon), build-vs-buy comparison, regulatory complexity addressed, no-code operational savings, and support model options. CZ-NST-2026-04-001.
Platform licence Cost justification
UC2 — ENDO AI Live
ENDO AI — Three Employee Pipelines
Pryzmat Media AI employee pipelines. UC2-1 Marcin: SMS ingest → lead qualification → schedule. UC2-2 Irena: document OCR → confidence-gate review → categorise → store. UC2-3 Przemek: voice ingest → Claude AI transform → CEO gate → forward. Blocks D-05 (Claude) and D-06 (org structure).
3 pipelines AI nodes
UC3 — ARC Live
ARC — Freelance CRM Pipelines
ARC freelance CRM three revenue pipelines. UC3-1a Email Ingest: Gmail OAuth → AI sentiment → store. UC3-1b Offer: Claude AI draft → freelancer review gate → PDF forward. UC3-2 Invoice Match: bank CSV → Nexus validate → tax report. Maps to existing arc/backend/* codebase.
3 pipelines ARC codebase
UC-E1 Planned
GAIA Edge — Environmental Monitoring
Edge-deployed Nexus pipelines for environmental sensor data ingestion, anomaly detection, and automated alerting at remote monitoring stations.
Edge Runtime IoT Sensors
UC-E2 Planned
Orion Edge — Industrial Process Control
Edge-deployed Nexus pipelines for industrial process monitoring, predictive maintenance triggers, and quality control automation.
Edge Runtime Industrial IoT
NX-S5 Live
Org Skin Research — T-24..T-35
Complete design system tokens for all 12 Nexus organisations: ARC, Pyrometrix/PFP, Nesto, Endo, Orion, Plato, SignalForge, AER, AES, EDR, CA-KB. Includes ChameleonBI placeholder widget requirements.
Styling Research CSS Tokens
M-NEXUS-D3 Queued
Demo Specification v1.0
Clarified vision statement, gap analysis (current vs. required demo), plan of remedy (REM-01–08), full user stories with every click and every visible view for the Nesto autonomous demo. Auto mode layer, form fill simulation, HR Manager Decision form.
Nesto UC1 April 2026
M-NEXUS-D4 Queued
Demo Vision v1.0
Complete vision for Nexus autonomous demo mode. All four orchestration levels, 9-step sequence, data template registry, RBAC-driven form generation per role, window.nexusAuto controller spec, and Pyrometrix design philosophy. Governs BL19–BL25 implementation.
Platform April 2026
04 Platform & Backlog

Product backlog, node implementation queue, and legacy Nexus platform documentation (system architecture, data model, production readiness).

NEXUS-BL-01 Pending
Product Backlog
12 backlog node implementations (BL01–BL12): SMS, HTTP Forward, AI Transform, OCR, Validator, Transformer, Scheduler, Voice Ingest, PDF Generator, Email Forward, Bank CSV, Report Generator. Priority order, status, dependencies, milestone mapping.
12 nodes Phase 5+
NEXUS-AUDIT Audit
Action Plan & Audit
Full system audit: lie analysis, what was falsely claimed complete, what does not exist, ordered action items A-01–A-12, documentation policy, sitemap, and sanctioned pipeline flow diagrams for all 3 use cases.
April 2026 12 action items
NEXUS-POLICY Active
Documentation Policy
P-01–P-12 documentation rules: no ASCII, site-nav required, no emojis, accurate status pills, file naming, product naming, sanctioned diagram types, cross-linking, color tokens, version tags, overflow:visible on nav, dropdown nav structure required. Full sitemap, diagram class reference, and compliance checklist.
v1.1 Apr 2026 12 rules
NEXUS-HIER Active
Document Authority Hierarchy
Six-tier authority diagram. Defines which document wins when sources conflict. Tier 1 ground truth, Tier 2 policy, Tier 3 architecture, Tier 4 specs, Tier 5 backlog, Tier 6 session state. Mandatory session-start reference for all agents. Known conflict register. Deferred decisions log for orphaned legacy files.
v1.0 Apr 2026 6 tiers
M-ORCH Active
Orchestration Platform Plan
M-ORCH milestone series. Nexus evolving into full orchestration platform with Nexus as canvas layer. Multi-tenant org/team/user model. Three-layer architecture: Tenancy, Pipeline, Canvas. Node type taxonomy and data model.
M-ORCH Apr 2026 3 layers
ROADMAP-IDEAS Active
Roadmap Ideas
Unscored engineering ideas gathered from development sessions. Covers rule engine, GPU/performance, connectors, productisation, and platform categories. Ideas feed the milestone planning process. Not committed to roadmap until moved to Action Plan.
v1.0 Apr 2026 Ideas backlog
PLATFORM-INT Live
Integration Guide
Complete REST integration reference sourced from the live API at api.nexus-dev.codezerogroup.com. Auth, API keys, org/pipeline management, execution, HumanGate, SSE streams, CDC, rules engine, and app-building sequence.
Developer Verified 2026-05-09
PLATFORM-ARCH Reference
System Architecture
Nexus platform architecture reference. FastAPI port 8010, Flask Admin port 8011. SQLite (dev) / PostgreSQL (prod). venv layout. Docker compose topology.
Engineering
PLATFORM-DM Reference
Data Model
Entity, Rule, Profile, Connector, Domain schema. Organisation, OrgTeam, OrgUser, NodeType, Pipeline, PipelineRun SQLAlchemy models. SHA-256 API key hashing pattern.
Engineering
PLATFORM-PR Reference
Production Readiness
Deployment checklist, health endpoints, backup procedures, monitoring configuration. Docker compose with PostgreSQL. ECS task definition. Bandit security scan results.
DevOps
05 ARC Documentation

Full documentation package for the ARC freelance CRM application sourced from C:/repos/arc/. Requirements, 10 automated pipeline designs, styling guide, and user manual. All content traced to ARC source code.

ARC-REQ-01 Live
ARC Requirements Specification
Full functional requirements for all 9 ARC modules: Dashboard, Clients, Projects, Emails, Calendar, Offers, Invoices, Bank, Agent System, and Gmail Backfill. Data model entity tables with field-level accuracy. API endpoint catalogue. All field names verified against arc/backend/app/models/.
9 modules 11 entities Source-verified
ARC-PIP-01 Live
ARC Pipeline Design
10 ARC automated and user-triggered pipelines as staged node tables. Covers: Gmail Ingest, Email Sentiment, Action Scoring, Calendar Sync, Offer AI Generation, Invoice from Offer, Bank CSV Import, Transaction Matching, Gmail Backfill, and AI Discovery Assessment. Source references in every stage row.
10 pipelines CRON/USER/AI stages
ARC-STY-01 Live
ARC Styling Guide
Complete design system for the ARC application. Color tokens from tailwind.config.ts: #FFFAF5 background, #F2A0B5 primary pink, #F4A261 orange accent, #FFF5F0 sidebar. Typography (Inter font), component specs (Card, Button, Input), 12px card radius.
Tailwind source Color tokens
ARC-MAN-01 Live
ARC User Manual
Step-by-step user guide for all 9 ARC navigation sections: Dashboard (action feed, calendar, financial summary), Clients, Projects, Emails (Gmail integration, sentiment), Calendar (bidirectional Google sync), Offers (AI step suggestions), Invoices, Bank (CSV import, matching), Settings and Gmail Backfill.
9 sections Step-by-step